ACTION PLAN

 
   

The project will be structured in the following Working Packages (WP). For time schedule details - please have a look in the calendar.

   

List of Deliverables (DE)

 

DeliverableNo

Title of the Deliverable

Date of Deliverable

Type of Deliverable

1

Line up of the work concept

1

Re

2

Organisation of the kick-off meeting

1

O

3

Establishment of the internet web-site

1

Re

4

Organisation of know-how- and information exchange between Germany and Bulgaria

4, 16

M

5

Coordinative and sequential tasks resulting from implementation of the different working packages

2-22

O

6

Preliminary report

4

Re

7

A report describing the supervision stand of the chemical drinking water parameters in Bulgaria

8

Re

8

Selection of the chemical parameters to be evaluated

8

Da

9

A guidance documentation on the health assessment of drinking water contaminants in Bulgaria

11

Re

10

Priority settlement (pre-selection) of the chemical parameters to evaluate in context of the hazard determination

15

Da

11

A report about the quality of the drinking water in Bulgaria

18

Re

12

A report over the necessary renovation- and investment needs for the quality assurance of the drinking water

22

Re

13

Publication and distribution of the results

22

Re, M

Re = Report; M = Meeting; Da = Data; Me = Method; Th = Theory; O = Others